Synthetic example / Snapshot screening

Two readings disagree.
Capacity is unknown.

Can these records support an additional 120 kW? This is a point-in-time evidence check, not a Stage 4 duration demonstration.

Unknown / request deferred

Reconcile the records before allocating more load.

Supported power is unknown. The engine allocation is 0 kW, not a finding of zero physical spare capacity.

Next action: reconcile measurement boundaries, units and timing; obtain time-aligned records before relying on the capacity claim.

Supplied simulated inputs
RecordValue
Additional load requested120 kW
Meter reading420 kW
Site-load reading300 kW
Disagreement120 kW

The two load measurements are assumed comparable only for this simulation. Their disagreement exceeds the strict 100 kW conflict threshold.

Interpretation

A supplied ceiling is not a demonstrated capability.

The 250 kW battery-discharge ceiling is an input, not independently demonstrated battery capability. A snapshot reporting horizon does not establish how long a battery could sustain a load.

Technical appendix: current and historical replay

Supplied site limit 1000 kW; site load 300 kW; reserve 120 kW. The historical arithmetic was 1,000 - 300 - 120 = 580 kW, capped by the supplied 250 kW battery ceiling. The meter was 420 kW: the 120 kW disagreement exceeds the strict 100 kW threshold. Historical weighted scoring allowed AVAILABLE and 250 kW. The committed conflict gate now returns OFFLINE_UNKNOWN and defers the request.

The normal corrected fixture uses matching 300 kW readings; this replay deliberately preserves the original conflict. Both measurements are assumed comparable only for this simulation. No arbitrary discount is applied.

Snapshot state and allocation differ from the separate Stage 4 combined result: true means all required checks pass over the supplied window, false retains an established modeled failure, and null means an unresolved conclusion. Null does not mean zero physical capacity.

Download generated inputs, findings and source hashes. This explanatory extract is not a complete replay package.

One site. One question. An agreed period.

First Site Evaluation

A complimentary, scoped review, subject to suitable records. Start with a high-level question; written authorization and data handling are agreed before records are shared.

Discuss a site question

An analyst maps the exports. Your engineer confirms the boundaries, timing, limits and assumptions.

Current scope and important limits

A defined, read-only review

The combined analysis follows supplied grid power, battery energy and diesel fuel profiles through a finite period, accounting for existing commitments, protected obligations and reserves. Headroom reads records; it does not operate equipment or need control credentials.

Software verification uses simulated records. Real-site applicability and external engineering review remain to be established. A finding is not a capacity certification, future-availability promise or revenue guarantee.

The supported equipment arrangement

One grid-connected site, one battery and one already-running No. 2-D diesel generator with an isolated, closed-return tank. Equipment facts, profiles, limits and permissions must be evidenced.

Export, startup, islanding, refueling, multiple assets, automatic dispatch and source-specific charging attribution are outside this method. A passing finite window does not establish repeatability or firm capacity.